Lead Renovator Prep: RRP 2026
Lead Renovator Prep: RRP 2026 Summary
Lead Renovator Prep: RRP 2026 is a with in-app purchases iOS app in Education by Deeun Inc.. Released in Mar 2026 (4 months ago). Store last updated Mar 11, 2026
Lead Renovator Prep: RRP 2026 SDKs Summary
App not yet scanned for SDKs.
0★
Ratings: 0
Screenshots
App Description
LEAD RENOVATOR PREP: STAY COMPLIANT. AVOID FINES. PASS THE EXAM.
The only app with XRF interpretation, risk assessment, and containment calculators for EPA Lead RRP certification.
XRF READING INTERPRETER
Get an XRF reading from a lead inspector? Know instantly what it means.
Enter the reading in mg/cm². The app tells you:
- Positive or negative for lead
- EPA vs HUD standard comparison
- Required actions if positive
- Documentation for your records
EPA threshold: 1.0 mg/cm² or higher = lead-based paint.
Below 1.0 = negative.
No more guessing. No more violations.
LEAD RISK ASSESSMENT CALCULATOR
Does your project require RRP work practices? Calculate it.
Interior work: More than 6 square feet per room triggers RRP.
Exterior work: More than 20 square feet total triggers RRP.
Window replacement: Always triggers RRP.
Enter your work areas. Get instant determination. Know before you start.
CONTAINMENT AREA CALCULATOR
How much plastic do you need? How many rolls of tape?
Enter room dimensions. Choose floor only or floor plus walls.
The app calculates:
- Square feet of plastic sheeting
- Linear feet of 9-foot rolls
- Tape needed for sealing
- Complete supplies checklist
Never run short on a job. Never overbuy materials.
EPA WORK PRACTICE CHECKLIST
Missing one step can cost you $37,500 per day in fines.
Our checklist covers every EPA requirement:
Pre-Work:
- Certified renovator assigned
- Firm certification verified
- Pre-renovation disclosure provided
- Warning signs posted
Containment:
- 6 mil plastic on floors
- Plastic extends 6 feet beyond work area
- HVAC vents covered
- Doorways sealed
Prohibited Practices:
- No open flame burning
- No heat guns above 1100°F
- No power sanding without HEPA
- No dry scraping over 1 sq ft
Cleaning:
- HEPA vacuum all surfaces
- Wet wipe all surfaces
- HEPA vacuum again
- Verify with cleaning cloth
Generate PDF records. Keep them for 3 years. Stay compliant.
1000+ PRACTICE QUESTIONS
RRP Requirements
- When the rule applies
- Square footage thresholds
- Pre-1978 buildings
Work Practices
- Step-by-step procedures
- Containment setup
- Cleaning protocols
Lead Testing
- XRF interpretation
- Paint chip testing
- Test kit usage
Prohibited Practices
- The six things you can NEVER do
- Temperature limits
- Equipment requirements
Plus: Pre-renovation disclosure, record keeping, certification requirements, pe