IET Wiring Regulations 2023

49K installs
Ratings not yet available
338 monthly active users
$<10K monthly revenue est.
IAP 58% · Ad 42%
Install Trends
Weekly +80
Steady
Monthly +253
Steady

IET Wiring Regulations 2023 Summary

IET Wiring Regulations 2023 is a ad-supported, with in-app purchases Android app in Education by Webrich Software. Released in Oct 2015 (10 years ago). It has about 49K+ installs Based on AppGoblin estimates, it reaches roughly 338 monthly active users and generates around $<10K monthly revenue (58% IAP / 42% ads). Store metadata: updated May 26, 2026, version 74.

Recent activity: 80 installs this week (253 over 4 weeks) showing steady growth View trends →

Data tracking: SDKs and third-party integrations were last analyzed on May 12, 2026.

Store info: Last updated on Google Play on May 26, 2026 (version 74).


0★

Ratings: 0

5★
4★
3★
2★
1★

Screenshots

App screenshot
App screenshot
App screenshot
App screenshot

App Description

IET Wiring Regulations is the ultimate professional companion for UK...

IET Wiring Regulations is the ultimate professional companion for UK electricians. Go beyond exam prep with on-site calculators, quick reference tables, inspection checklists, and digital certificates you’ll use every working day.

--- EXAM PREP ---
Over 580 practice questions across 9 topics covering BS 7671:2018+A2:2022 (18th Edition with 2022 Amendment and 2023 Corrigendum). Comprehensive explanations with section and page references for every answer. Mock tests with weighted scoring track your readiness for C&G 2382-18.

--- 21 BS 7671 CALCULATORS ---
• Cable Sizing - current carrying capacity per BS 7671
• Voltage Drop - mV/A/m calculations (Table 4D5B)
• R1+R2 - conductor resistance from Table I1
• Conduit & Trunking Fill - cable fill calculations
• Cable Resistance at Temp - temperature correction
• Earth Fault Loop (Zs) - impedance check against Table 41
• Prospective Fault Current (PFC)
• Adiabatic Equation - minimum CPC size (Table 54.4)
• MCB / RCBO Selector - device selection per Reg 411
• Discrimination - upstream/downstream coordination
• Connected Load Total - maximum demand (Appendix A)
• Diversity - demand reduction factors
• Three-Phase Balancing - load distribution
• Power Factor Correction
• Ohm’s Law / Power - foundational calculations
• Ring Final Circuit - R1, R2, Rn checks
• EV Charger Installation - Section 722 compliance
• Motor Circuit - design per Reg 552
• Solar PV / DC Sizing - Section 712
• Earthing & Bonding - conductor sizing (Table 54.8)
• Lighting / Downlights - lumen and spacing calculations

--- 12 QUICK REFERENCE CATEGORIES ---
• Key Formulas - essential BS 7671 equations
• Zs Values - earth fault loop impedance tables
• Cable Capacities - current ratings by installation method
• Correction Factors - Ca, Cg, Ci grouping and thermal factors
• Voltage Drop - mV/A/m tables and permissible limits
• Conductor Resistance - R1+R2 reference values
• Earthing & Bonding - systems, conductors, and sizing
• Special Locations - bathroom zones, swimming pools, saunas
• IP Ratings - ingress protection code reference
• RCD Requirements - types, ratings, and where required
• Disconnection Times - maximum times by circuit type
• Insulation Resistance - minimum IR values by voltage

--- 8 PROFESSIONAL UTILITIES ---
• Amendment Tracker - follow all changes from the 18th Edition through Amendments 1-3
• CPD Logger - log continuing professional development hours with annual target tracking
• Dead Testing - digital schedule of test results for dead testing
• Live Testing - digital schedule of test results for live testing
• Visual Inspection - digital schedule of inspection checklist
• Digital Certificates - create and export EICR and EIC certificates as PDF
• EICR Coding Guide - quick reference for C1, C2, C3 and FI observation codes
• Part P Guide - interactive decision tree for Building Regulations Part P compliance

--- EXAM TOPICS ---
• Part 1 - Scope, Object and Fundamental Principles
• Part 2 - Definitions
• Part 3 - Assessment of General Characteristics
• Part 4 - Protection for Safety
• Part 5 - Selection and Erection of Equipment
• Part 6 - Inspection and Testing
• Part 7 - Special Installations or Locations
• Part 8 - Prosumers Installation
• Use of Appendices

--- BUILT FOR THE JOB SITE ---
Flash cards for quick revision. Mock tests with weighted scoring. Progress tracking with pie charts. Works offline. All data saved locally on your device.

Whether you’re preparing for your C&G 2382-18 exam, carrying out an EICR, or sizing cables on site – IET Wiring Regulations is the one app every electrician needs.

• Privacy Policy: http://www.webrichsoftware.com/privacy.html
• EULA: https://www.apple.com/legal/internet-services/itunes/dev/stdeula/